Tag Archives: waste

ADJUMANI. For the past four months, support staff in the hospital have been dumping medical waste within the enclosure of the incinerator rather than burning it. The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday the incinerator resigned because of continuous burning of collected waste from the hospital. “The waste has grown due to the overwhelming number of admissions and individuals visiting the hospital section. However, we must find solutions to protect the staff and environment,” Ojja said. He said the incinerator was too small to dispose of the hospital’s voluminous medical waste. Patients admitted to the general ward next to the incinerator expressed fear of ailments arising from bad disposal of toxic medical waste. According to the 2013-2014 yearly health industry performance report, Adjumani Hospital registers 11,731 in-patients, 83,953 outpatients and 1,695 deliveries. Scientific facts Incineration of heavy metals or materials with high metal content (in particular…

Read more

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner:  a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

Veolia is looking to supply non-recyclable commercial and industrial waste for its Newhaven Incinerator from regions neighbouring East Sussex and Brighton and Hove. It asserts this will permit the incinerator to create sufficient energy to power 25,000 homes always. However, cllr Rod Main from Newhaven said this could lead to more pollution and trucks. Veolia applied for planning permission to East Sussex County Council to raise a planning condition to permit the scheme to proceed. General manager for Veolia in South Downs Allan Key said the firm wanted to expand the catchment area outside East Sussex and Brighton and Hove. He explained it wouldn’t result in physical changes at the incinerator or boost to the 242,000tpa capacity. Facilities like the one we’ve got here in Newhaven recovers energy from waste that could otherwise be lost by moving out of county landfill” Cllr Main stated:”They want more waste to assist ESCC’s…

Read more

Ability of destruction in weight: 60 Kg/h. It should be able to work less 10 hours/day This incinerator must have the ability to destruct all combustible wastes produced by hospitals, private practices, labs, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by simply controlling the gasification of waste. The incinerator must prevent the discharge of smoke and dust that is fine, (Smokeless) during the loadings. It should have the ability to reduce the quantity of wastes from 98%. It should be able to hold emission in the next burn with gas residence of less than two seconds. The incineration should be completely free of visible smoke as well as offensive odours. The lower volt electricity (L.C.P) of the waste will be 3,500 kcal/kg The Temperatures of combustionMinimum will be 850oC and maximum 1400oC Post combustion: 1100oC. The Inner diameter of the Chimney: Ø…

Read more

On Friday Attorney General Buddy Caldwell declared the State of Louisiana reached an arrangement with Texas incinerator Veolia Environmental Services and Louisiana toxic waste landfill Chemical Waste Management to ensure that incinerator ash associated with the recent Dallas Ebola virus occurrence won’t be transported or disposed of in Louisiana,. On Oct. 13 the Louisiana Attorney General’s office got a restraining order in the 19th Judicial District Court to temporarily stop the transfer of incinerated Ebola ash into Louisiana. The temporary retraining order was extended on Oct. 21 at the request of all parties, until finally arriving at today’s arrangement. Attorney General Caldwell stated,”I’m pleased today’s arrangement ends this chapter in the controversy of the transportation and disposal of Ebola waste”

In assessing these options, the U.S. military held the assumption that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese team of investors is planning to develop in an integrated resort — will be closed and that a transfer station has been considered. MARFORPAC environmental specialist Sherri Eng said the dumpsite is not something that the military will have the ability to use. Just by looking at the requirements and the benefits of the options researched, Eng said that the simplest are the off-island disposal.” In choosing the off-island disposal alternative, the parties might need to check in the capacity of the Marpi landfill to adapt the waste coming from Tinian — both military and civilian waste. Eng, at a meeting with the regional regulatory agencies and officials walked them through the three systems being considered. Choice 1: Incineration Eng said the system that…

Read more

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the province’s rejection of its proposed Bylaw 280, which was integral to the solid waste management program since it could have ensured garbage generated in Metro was retained in the area. Belkorp, which runs the Cache Creek dump, has been engaged in a high-profile lobbying effort against Bylaw 280 also as Metro Vancouver’s plans to burn the area’s waste rather than landfill it. Metro is slated to shut the Cache Creek dump in 2016. “We are still battling for alternatives that are better than the incinerator,” said Russ Black, Belkorp’s vice-president of corporate growth.…

Read more

FARGO, N.D. — California health officials have given note that North Dakota is among six countries that may get Ebola medical waste in case the state has any material to incinerate. In a note published last week, the California Department of Public Health listed North Dakota as one of six states where California pushes medical waste to be incinerated when onsite disposal isn’t available at health facilities. Healthcare Environmental Services Inc., located at a nearby park in 1420 40th St. N. at Fargo, operates a medical waste incinerator which also accepts waste from other locations. Calls for Healthcare Environmental Services on Tuesday afternoon Weren’t returned. The company is owned by Sanford Health. A Sanford spokeswoman said it couldn’t immediately comment on the possible incineration of Ebola waste from California in the Fargo facility. up to now, California has no known Ebola cases, according to the state health department, which spelled…

Read more

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.

90/153