Tag Archives: will

The Board of County Commissioners broke plans Thursday for a regional waste-to-energy incinerator, preferring to haul the county’s waste to a landfill using a short-term contract instead. Commissioners Paul Smith and Billy Shreve cast the dissenting votes to maintain the job on the dining table while the county investigates its options. “It is absolutely no charge to the county to maintain these options open,” Smith stated. “To do away with these choices is mad.” Terminating the undertaking will not cost the county any money as the Northeast Maryland Waste Disposal Authority, a quasi-governmental service that helps the county meet its trash disposal needs, will cover the $500,000 conclusion fee. Any remaining funds after this payment will be divided between Frederick County and Carroll County, which was once a partner in the undertaking. These funds are out of payments the authority has obtained from Wheelabrator after the service contract has been…

Read more

PESHAWAR: Based on information gathered by the Environmental Protection Agency (EPA), 15 to 20 tons of hospital waste is made every day in the provincial capital alone. Nearly half of the total waste is recycled while the remainder is accumulated by the Peshawar Development Authority (PDA). LRH “To be truthful, we have one incinerator which is not in proper working condition and hardly disposes a quarter of the total waste generated,” said an official in Lady Reading Hospital while requesting anonymity. “But we have a new incinerator which will soon be functional.” The officer, who didn’t know the specific figure of the waste created, said LRH has been one of the most popular hospitals across the nation. It has over 5,000 people (at least 3,000 in outpatient and 2,000 in accident and emergency departments) from across the province on a daily basis. “The incinerator below process has some problems as…

Read more

Veolia is looking to supply non-recyclable commercial and industrial waste for its Newhaven Incinerator from regions neighbouring East Sussex and Brighton and Hove. It asserts this will permit the incinerator to create sufficient energy to power 25,000 homes always. However, cllr Rod Main from Newhaven said this could lead to more pollution and trucks. Veolia applied for planning permission to East Sussex County Council to raise a planning condition to permit the scheme to proceed. General manager for Veolia in South Downs Allan Key said the firm wanted to expand the catchment area outside East Sussex and Brighton and Hove. He explained it wouldn’t result in physical changes at the incinerator or boost to the 242,000tpa capacity. Facilities like the one we’ve got here in Newhaven recovers energy from waste that could otherwise be lost by moving out of county landfill” Cllr Main stated:”They want more waste to assist ESCC’s…

Read more

Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around town. A Labour county councillor nevertheless has stated it is like moving pieces around a chess board. “But neighborhood resident Andrew McLuskey has done all of the hard work. “But in saying that, we’re still fighting off to stop growth occurring at Heathrow at all. “There are still serious reservations and I do not feel an expansion of the airport is right for the region or the whole country. “We’re talking semantics here — it’s a big growth in a very cramped area. It’s like moving pieces around a chess board — whatever we do not like around Stanwell will be just as enormous someplace else.” Changes to the programs include introducing a 15 mile’green corridor’ which will increase the quantity of recreational distance between town and a new car…

Read more

In assessing these options, the U.S. military held the assumption that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese team of investors is planning to develop in an integrated resort — will be closed and that a transfer station has been considered. MARFORPAC environmental specialist Sherri Eng said the dumpsite is not something that the military will have the ability to use. Just by looking at the requirements and the benefits of the options researched, Eng said that the simplest are the off-island disposal.” In choosing the off-island disposal alternative, the parties might need to check in the capacity of the Marpi landfill to adapt the waste coming from Tinian — both military and civilian waste. Eng, at a meeting with the regional regulatory agencies and officials walked them through the three systems being considered. Choice 1: Incineration Eng said the system that…

Read more

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

8/8